BREEAM Passive design
Contents |
[edit] Aim and benefits
Passive design is one of the first steps in the Energy Hierarchy:
The energy hierarchy aims to help designers methodically work through reducing energy demand in a building and making systems as efficient as possible prior to just installing renewable technologies. Often reducing demand and increasing efficiency are skipped in favour of "sticking some PV panels on the roof" just to meet building regulations (or enhanced regulations such as The London Plan).
Passive Design is a design technique which uses the natural movement of heat, air and light to keep internal conditions in a building comfortable. By using natural movements, there is a reduced need for energy consuming Active Design measures such as comfort cooling, heat exchangers, boilers etc.
The aim of this issue is to encourage designers to adopt measures which reduce energy consumption and associated carbon emissions, while minimising reliance on active building services systems.
This issue offers the following potential benefits to end users and clients:
- Reduced energy demand without too significant additional costs.
- Measures are relatively straightforward to include provided they are considered during the early stages of the project.
[edit] When to consider
The earlier in RIBA Plan of Work 2013 Stage 2 this can be considered, the better. Frequently however you'll find that many of the early passive design decisions are made by designers without documenting them and that the actual report which can be used as BREEAM evidence may only be produced towards the end of the RIBA Plan of Work 2013 Stage along with the Stage 2 report.
[edit] Step by step guidance
Awaiting content
[edit] Questions to ask while seeking compliance
Awaiting content
[edit] Tools and resources
BREEAM UK New Construction 2014 Issue 5.0 Criteria - ENE 04
BRE Knowledge base related articles
[edit] Tips and best practice
The evidence you need will more than likely be in a Stage 2 report, or Energy Strategy which likely will have been submitted to planning. Ctrl+F "Passive" "Lean" "Natural" to get to the right section.
If a passive design analysis is not being included in Stage 2/Energy Strategy reports, sometimes it's helpful to give engineers a blank template and tell them that essentially if they put something in each box, it'll end up compliant. This helps to stop certain aspects being overlooked without stifling their creativity in the design decision making process. An example can be found above.
[edit] Typical evidence
[edit] RIBA Stage 2 Evidence
Typically a report. A checklist of things to check the report contains:
- Does it cover all criteria in the compliance note relating to content (CN4 in UK New Construction 2014 Issue 1.0)
- Is the project name stated?
- Is it dated?
- Is the author and their company stated?
- Is it clearly stated that the report was produced during RIBA Stage 2? Or have you provided additional evidence to confirm that the date it was written was during RIBA Stage 2?
[edit] RIBA Stage 2/3 Evidence (Might come earlier)
The RIBA Plan of Work states that typically the engineers will produce an initial Part L report (BRUKL) during RIBA Stage 2, and a more accurate report during RIBA Stage 3. While the Part L report itself won't technically give you an energy demand reduction solely due to passive measures♦, the production of it does allow for you to know that it's time for your building physicist could produce the required evidence.
♦Many assessors will use the change in Energy Demand as stated on the Part L Report. This is technically wrong for various reasons, such as the Part L model not necessarily using realistic glazing in the notional building. Technically a building physicist should model two buildings, with the same glazing area, but with only the passive design measures varying. The baseline model should be modelled so that it is no worse than building regs values. You would then get two Part L Reports, and would need to compare the Primary Energy Demand (or CO2 emissions in BREEAM UK 2018 or International 2016) of the Actual Building for each to show a meaningful reduction.
A checklist of things to check the report contains:
- Do you have 2 x Part L reports, and is it clear which one relates to your actual designed building and which relates to the building without passive measures?
- Have both reports been produced by an accredited energy assessor or CIBSE member?
- If you're not confident with percentages, has the engineer confirmed the percentage reduction in energy demand (or CO2 emissions for BREEAM International 2016 and UK 2018) as a result of passive design measures?
LASTLY, DON'T FORGET CRITERIA 1: Have you awarded the thermal modelling credit?
[edit] Post Construction Evidence
- As per RIBA Stage 2 evidence.
- "As built" versions of the Stage 3/4 evidence.
- Site Inspection report highlighting passive design measures where possible (building form, orientation, natural ventilation possibly).
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- UK New Construction 2014
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Tom Blois-Brooke 16:32, 01 Jul 2019 (BST)
[edit] Related articles on Designing Buildings Wiki
- BREEAM Energy monitoring
- BREEAM External lighting
- BREEAM Free cooling
- BREEAM Low carbon design
- BREEAM LZC technologies
- BREEAM Passive design
- BREEAM Reduction of energy use and carbon emissions
- BREEAM.
- Building fabric.
- Daylighting.
- Natural ventilation.
- Passive building design.
[edit] External references
Featured articles and news
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.