SCK•CEN, the Belgian Nuclear Research Centre in Mol has been working for several years on the design of a multi-purpose irradiation facility in order to replace the ageing BR2 reactor, a multi-functional materials testing reactor (MTR), in operation since 1962.
MYRRHA, a flexible fast spectrum research reactor (50-100 MWth) is conceived as an accelerator driven system (ADS), able to operate in sub-critical and critical modes. It contains a proton accelerator of 600 MeV, a spallation target and a multiplying core with MOX fuel, cooled by liquid lead-bismuth (Pb-Bi).
|