    Nuclear Power in Mexico

    (updated November 2012)

    • Mexico has two nuclear reactors generating almost 4% of its electricity. 
    • Its first commercial nuclear power reactor began operating in 1989. 
    • There is some government support for expanding nuclear energy to reduce reliance on natural gas, but recent low gas prices have overshadowed this. 

    Mexico is rich in hydrocarbon resources and is a net energy exporter. The country's interest in nuclear energy is rooted in the need to reduce its reliance on these sources of energy. In the next few years Mexico will increasingly rely on natural gas, and this is central in the new 2012 energy policy. The Federal Electricity Commission (CFE) planned to invest $4.9 billion in 2011 and $6.7 billion in 2012 in new gas-fired plant and converting coal plants to gas.  In addition it is calling for tenders to build three major natural gas pipelines.

    Energy growth was very rapid in the decades to the late 1990s, but then levelled off for a few years.  From about 2007 electricity demand is expected to grow again at an average rate of almost 6% a year. In 2011, 272 billion kWh was generated. The electricity supply is quite diverse, with gas supplying 135 TWh (50%), oil 48 TWh (18%), coal 34 TWh (12.5%), hydroelectric 36 TWh (13%) and nuclear 10 TWh (3.7%) in 2011. Per capita power use is about 1900 kWh/yr.

    Of total 62 GWe capacity in 2010, nuclear was 1.37 GWe (gross), hydro 11.2 GWe, geothermal 970 MWe and the balance fossil fuels.

    Capacity is projected to increase to 86 GWe by 2025.

    Nuclear industry development

    Mexico's interest in nuclear energy was made official in 1956 with the establishment of the National Commission for Nuclear Energy (CNEN). That organisation took general responsibility for all nuclear activities in the country except the use of radioisotopes and the generation of electric power. The Federal Electricity Commission  (CFE), one of the two state-owned electricity companies, was assigned the role of future nuclear generator.

    Preliminary investigations to identify potential sites for nuclear power plants were begun in 1966 by CNEN and CFE and in 1969 CFE invited bids for proven power plant designs with a capacity of around 600 MWe. In 1972 a decision to build was made, and in 1976 construction began at Laguna Verde on two 654 MWe General Electric boiling-water reactors (BWRs).

    Although Mexican industry did not supply major components for the Laguna Verde plant, Mexican companies undertook the civil engineering work and Mexican staff maintain the reactor and train to operate it at CFE's simulator.

    CNEN was later transformed into the National Institute on Nuclear Energy (INEN), which in turn was split in 1979 into the National Institute of Nuclear Research (ININ), Mexican Uranium (Uramex) and the National Commission on Nuclear Safety and Safeguards (CNSNS). Uramex's functions were taken over by the Ministry of Energy in 1985.

    Operating Mexican power reactors 

    Reactors Model Net MWe First power Operating to
    Laguna Verde 1
    BWR
    800 approx
    1989
    2029
    Laguna Verde 2
    BWR
    800 approx
    1994
    2034
    Total (2)
     

     
    1600 MWe
     

     
     

     

    In February 2007 CFE signed contracts with Spain's Iberdrola Engineering and also Alstom to fit new turbines and generators to the Laguna Verde plant at a cost of US$ 605 million.  The main modifications consist of a turbine and condenser retrofit and the replacement of the electric generator, main steam reheater and the feedwater heater.  With approval from the CNSNS, the reactors were uprated progressively by 138 MWe each from 2008 to January 2011. As a first step, 11.6 MWe uprates to both units were achieved in 2007 through better flow control. In February 2011 Iberdrola announced that both units were operating at 820 MWe gross, about 800 MWe net, a 20% increase from the previous 665.5 MWe net.  Their operating life was also extended to 40 years.

    New capacity 

    High-level government support exists for an expansion of nuclear energy, primarily to reduce dependence on natural gas, but also to cut carbon emissions - until 2011 the country's energy policy called for increasing carbon-free power generation from 27% to 35% of total by 2024. The CFE in May 2010 had four scenarios for new power generation capacity from 2019-28, ranging from a heavy reliance on coal-fired power plants to meet growing demand, to a low-carbon scenario that calls for big investments in nuclear and wind power. 

     Under the CFE's most aggressive scenario, up to ten nuclear power plants would be built so that nuclear energy supplied nearly a quarter of Mexico's power needs by 2028, which would allow the country's carbon emissions from power generation to remain virtually unchanged from 2008 despite projections of substantially higher demand. An earlier proposal was for one new nuclear unit to come on line by 2015 with seven more to follow it by 2025 to bring nuclear share of electricity up to 12% then. Cost studies showed nuclear being competitive with gas at about US$ 4 cents/kWh in all scenarios considered.  However, with low gas prices in 2010 a decision on building new nuclear capacity was delayed until 2012. CFE in November 2010 was talking about building six to eight 1400 MWe units, the first two at Laguna Verde.  With the release of the 2012 energy policy, the government urged looking beyond low gas prices to consider building two more reactors at Laguna Verde, as a first step in expanding nuclear capacity to 2026.

    In the longer term, Mexico may look to employ small reactors such as IRIS to provide power and desalinate seawater for agricultural use.

    ININ have previously presented ideas for a plant consisting of three IRIS reactors sharing a stream of seawater for cooling and desalination. With seven reverse-osmosis desalination units served by the reactors, 140,000m3 of potable water could be produced each day, as well 840 MWe.

    Fuel cycle

    Since incorporating Uramex, the Ministry of Energy has had responsibility for uranium prospecting, which it delegates to the Mineral Resources Board. Mexico has identified reserves of about 2000 tonnes of uranium but this has not been mined to date.

    A uranium milling plant operated on an experimental basis at Villa Aldana, in the Chihuahua region at the end of the 1960s but has now been decommissioned. Tailings were disposed of at Pena Blanca.

    Under Mexican legislation, nuclear fuel is the property of the state and is under the control of the CNSNS.

    Used nuclear fuel from the Laguna Verde reactors is stored underwater at the site. The storage pools have been re-racked to provide enough space for the reactors' entire lives. About 1000 tonnes of used fuel was there as of 2003. The same strategy is employed with used fuel from research reactors.

    Radioactive waste management

    The government of Mexico, through the Ministry of Energy is responsible for the storage and disposal of nuclear fuels and radioactive waste irrespective of their origin.

    The Energy Ministry is beginning to take administrative and budgetary steps to create a national company to manage its radioactive waste. It is also planning to sign the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management.

    An engineered near-surface disposal site for low-level waste (LLW) operated at Piedrera between 1985 and 1987. In that time, 20,858m3 of waste was stored.

    A collection, treatment and storage centre for LLW has operated at Maquixco since 1972.

    Regulation and safety

    The 1984 Act on Nuclear Activities states that the government, through the Ministry of Energy, is responsible for establishing the framework for the use and development of nuclear energy and technology, in accordance with the national energy policy.

    The National Commission on Nuclear Safety and Safeguards (CNSNS) is a semi-autonomous body under the authority of the Ministry of Energy which takes the role of regulator. CNSNS is responsible for ensuring the proper application of regulations and safeguards for nuclear and radiation safety and for physical protection of nuclear and radiological installations to ensure public safety.

    CNSNS is also responsible for revising, evaluating and approving the criteria for the siting, design construction operation and decommissioning of nuclear installations, proposing the relevant regulations. It has the power to amend of suspend the licenses of nuclear facilities, which are granted on CNSNS approval through the Ministry of Energy.

    R&D

    The main nuclear research organisation in Mexico is the National Nuclear Research Institute (NNRI). NNRI have operated a 1000kW Triga Mk III research reactor since November 1968.

    The University Autonoma de Zacatecas has a subcritical Chicago Modelo 900 assembly used for training, commissioned in 1969.

    A Nuclear Cooperation Agreement between Mexico and Canada was signed in 1995 for the exchange of information in R&D, health, safety, emergency planning and environmental protection. It also provides for the transfer of nuclear material, equipment and technology and the rendering of technical assistance.

    Non-proliferation

    The Mexican Constitution states that nuclear energy may only be used for peaceful uses and this is reiterated in the 1984 Act on Nuclear Activities.

    Mexico ratified the Nuclear Non-Proliferation Treaty in 1969 and the Additional Protocol in 2004. It is also party to the 1979 Convention on the Physical Protection of Nuclear Material, ratified in 1988. Furthermore, Mexico is the depository of the 1967 Treaty for the Prohibition of Nuclear Weapons in Latin America (the Tlatelolco Treaty) and has been party to the Treaty since 1967.

    Sources:
    IAEA 2003, Country Nuclear Power Profiles.
    Nuclear Legislation in OECD Countries, Regulatory and Institutional Framework for Nuclear Activities, OECD/NEA, 2003.
    Radioactive Waste Management Programs in OECD/NEA Member Countries, OECD/NEA, 2005.
    Nuclear Engineering International, October 2004.

     

     Facebook | Twitter | YouTube | Google+ | WNA Update  | Jobs |  Nuclear Portal |  Glossary  |  eShop  |  Picture Library 

    © World Nuclear Association. All Rights Reserved
    World Nuclear Association, registered in England and Wales, number 01215741. Registered office: 22a St James's Square London SW1Y 4JH UK
    Â