What is IEC 61850?
Understand IEDs, Logical Nodes, MMS, Reporting, GOOSE and SCL with familiar substation examples.
Discover live IED models, troubleshoot Reporting and GOOSE, and produce reviewable FAT evidence in one Windows workstation.


Connect the approved IED, inspect the live model, and preserve identity, quality, and time without losing engineering context.
Explore capabilitiesChoose the question that brought you here. Each path gives you a useful takeaway, a practical workflow and the engineering detail behind it.
Understand IEDs, Logical Nodes, MMS, Reporting, GOOSE and SCL with familiar substation examples.
Connect an IED by IP, discover the live model and read one point together with quality and timestamp.
Run imported SDI points in order, preserve ON and OFF evidence, and export Excel, PDF or a portable project.
Start from the symptom: port 102, silent reports, occupied RCB, GOOSE sequence, missing COMTRADE or rejected SCL.
Use the IO List when the test plan is already defined. Use the IED endpoint or SCL when you need broader discovery and diagnosis.
TestPointId.arsasThe Learning Center connects protocol concepts to the actual ARSAS workflow, then links directly to troubleshooting when the expected result does not appear.
Move from learning and first connection to repeatable FAT, site validation, commissioning and multi-vendor integration.
Execute imported SDI points and carry reviewable results to another workstation.
Validate models, reports, GOOSE, control outcomes, file access and integration output.
Reconfirm endpoints, reporting, station-bus behavior, fault records and command completion.
Generate or normalize bounded SCL and isolate identity, DataSet, RCB and GOOSE mismatches.
Current screenshots show independent IED sessions, live values, GOOSE supervision and diagnostics. The tutorials explain what to look for in each workspace.

Each device retains its own association, model, monitoring state and diagnostic history.

Device identity, reference, value, quality, timestamp and acquisition source remain together.

Inspect stream identity, sequence, retransmission and ordered payload evidence.

Keep failures attributable before changing the IED, network or project file.
Review Release Notes before assuming the latest published package contains every workflow shown on the website.